Capture and structure packaging master data
Packaging items and their master data flow directly from your ERP into cubemos, eliminating Excel spreadsheets and manual transfers. Once connected, materials, weights, components, and product assignments automatically flow into the system, providing the same depth and up-to-date information you're accustomed to from your ERP system. cubemos automatically classifies each package by material type, format, and function, and checks it against the scope of the PPWR. You can see at a glance which packaging falls under which requirements, such as recycled content, recyclability, or reusability. No item-by-item research, no uncertainty about what needs to be done.
%20(1).avif)

Seamless PPWR Compliance Documentation
Every assessment, supplier document, declaration of conformity, and change remains in the system automatically, seamlessly, with date and accountability. cubemos builds your PPWR documentation per packaging unit in the background while your team and suppliers work. No separate collection, no disorganized folders, no frantic searching when it matters. When authorities audit, the auditor comes knocking, or a trading partner requests proof, everything is at your fingertips, filtered by packaging and assigned to the respective product. Compliance isn't established just by the deadline, but is generated as part of ongoing operations.
%20(1).avif)

Seamlessly integrate suppliers
Every packaging supplier gains access to the cubemos portal, free of charge, without training or setup. There, they store technical data sheets, material specifications, proofs of recycled content, and declarations of conformity directly linked to the respective packaging unit. cubemos automatically requests these documents as soon as they are required and sends reminders if they are outstanding. This way, the documentation goes where it belongs: with the packaging, not in an email request. From individual components, cubemos compiles the declaration of conformity for the entire packaging unit, ensuring it is complete, up-to-date, and auditable down to the last component.
%20(1).avif)



%20(1).png)

.avif)




.avif)
